![]() If the adhesive used to install the flooring does not have the correct moisture tolerance for the concrete subfloor, the entire installation can be at risk. Recent trends toward restricting volatile organic compounds (VOCs) in flooring adhesives have increased the number of moisture-sensitive adhesives used. Moisture-related adhesive failures are a problematic reality in the flooring business. 3 Common Flooring Materials Run The Risk of Moisture-related Problems: 1. Moisture-related damage to the flooring materials is possible. The slab must also dry to a specified moisture level before installing flooring materials. ![]() Once the slab is poured, the excess moisture must be left to strengthen the concrete bond. Moisture Management Requires Accurate Moisture Readings.How to Tell If There Is Excessive Moisture in My Subfloor.How to Prevent Subfloor Moisture Issues.What Are Causes of Excess Moisture in a Concrete Slab.3 Common Flooring Materials Run The Risk of Moisture-related Problems.Here is what you’ll learn in this article to have a successful installation: However, allowing excess moisture to leave the slab after it’s poured is crucial to a successful flooring installation. ![]() Water is an inherent part of the hydration process of concrete. How to Choose a Moisture Measurement System for Your Sawmill Buying Guide.Flooring, Millwork, Furniture & Cabinet Manufacturers.Why You Should Use Relative Humidity (RH) Testing.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |